You don't have javascript enabled. Good luck with that.
Pencarian
BPPBJ DKI Didesak Percepat Proses Lelang

Jakarta BPPBJ Demanded to Speed Up Auction Process

Jakarta Housing and Government Building Dept is complaining the slow process of determining the auction winner in Jakarta Goods and Service Procurement Agency (BPPBJ).

BPPBJ must set the auction winner soon

Head of Jakarta Housing and Government Building Dept, Arifin disclosed, the slow of determining the auction winner in Jakarta BPPBJ has hampered physical work in his rank. 

"BPPBJ must set the auction winner soon," he stated, Thursday (7/28).

BPPBJ Led by One of the Best indonesian Assessors

He disclosed, this year, the Housing Dept gets budget around Rp 4 trillion. It is mostly used for physical construction such as the flat.

"Flat construction is almost 30 projects, building maintenance 20 projects and local government building with 13 projects. All projects are still under auction process," he expressed.

According to him, acceleration in auction process in BPPBJ is very needed. Considering budget absorption in his rank is reaching 3.47 percent.

"I'm optimistic budget absorption can increase. 2016 budget must wait for five months ahead," he finished.

Linked News
Popular News indeks
  1. Jakarta Govt-City Council Step Up Coordination to Address Key Urban Challenges

    access_time22-02-2026 remove_red_eye1442 personFakhrizal Fakhri
  2. CNY 2577 Kongzili: Matakin Calls for Justice and Solidarity

    access_time22-02-2026 remove_red_eye901 personAldi Geri Lumban Tobing
  3. BPBD Issues Alert Over Tidal Flooding in 12 Jakarta Coastal Areas

    access_time25-02-2026 remove_red_eye888 personAldi Geri Lumban Tobing
  4. Free Tattoo Removal at Sunda Kelapa Mosque Targets 100 Residents

    access_time24-02-2026 remove_red_eye857 personFolmer
  5. Jakarta Pavilion at TMII to Undergo Full Revitalization

    access_time24-02-2026 remove_red_eye608 personDessy Suciati