You don't have javascript enabled. Good luck with that.
Pencarian
BPPBJ DKI Didesak Percepat Proses Lelang

Jakarta BPPBJ Demanded to Speed Up Auction Process

Jakarta Housing and Government Building Dept is complaining the slow process of determining the auction winner in Jakarta Goods and Service Procurement Agency (BPPBJ).

BPPBJ must set the auction winner soon

Head of Jakarta Housing and Government Building Dept, Arifin disclosed, the slow of determining the auction winner in Jakarta BPPBJ has hampered physical work in his rank. 

"BPPBJ must set the auction winner soon," he stated, Thursday (7/28).

BPPBJ Led by One of the Best indonesian Assessors

He disclosed, this year, the Housing Dept gets budget around Rp 4 trillion. It is mostly used for physical construction such as the flat.

"Flat construction is almost 30 projects, building maintenance 20 projects and local government building with 13 projects. All projects are still under auction process," he expressed.

According to him, acceleration in auction process in BPPBJ is very needed. Considering budget absorption in his rank is reaching 3.47 percent.

"I'm optimistic budget absorption can increase. 2016 budget must wait for five months ahead," he finished.

Linked News
Popular News indeks
  1. Nighttime Surveillance on Railroad Banks of Jalan I Gusti Ngurah Rai Intensified

    access_time08-05-2026 remove_red_eye2611 personNurito
  2. Governor Pram Appreciates Residents for Keeping Jakarta Safe and Comfortable

    access_time09-05-2026 remove_red_eye945 personFolmer
  3. PSEL Project to Solve Jakarta's Waste Crisis, Says Pramono

    access_time06-05-2026 remove_red_eye906 personDessy Suciati
  4. Jakarta`s 499th Anniversary and a Waste Sorting Movement Launched

    access_time10-05-2026 remove_red_eye679 personTiyo Surya Sakti
  5. CFD will Be Held on Jalan HR Rasuna Said

    access_time08-05-2026 remove_red_eye617 personDessy Suciati